• HOME
  • CEI
    • Wekiva 7A/B
    • I-4 Resurfacing
    • SR 44
    • I-95
    • US 441
    • Maintenance Work
    • A1A
  • TRANSPORTATION
    • Apopka Trail Network
    • Beresford Ave Extension
    • St. Johns River
    • Ocoee Apopka Road
    • Coastal Woods
    • Harmon Road Extension
    • SR-44 Resurfacing
    • Granada Pointe
    • Yorktowne Boulevard
  • THE TEAM
  • OFFICES
  • CAREER
  • SOCIAL
  • NEWS
  • SERVICES
  • PROJECTS
  • More
    • HOME
    • CEI
      • Wekiva 7A/B
      • I-4 Resurfacing
      • SR 44
      • I-95
      • US 441
      • Maintenance Work
      • A1A
    • TRANSPORTATION
      • Apopka Trail Network
      • Beresford Ave Extension
      • St. Johns River
      • Ocoee Apopka Road
      • Coastal Woods
      • Harmon Road Extension
      • SR-44 Resurfacing
      • Granada Pointe
      • Yorktowne Boulevard
    • THE TEAM
    • OFFICES
    • CAREER
    • SOCIAL
    • NEWS
    • SERVICES
    • PROJECTS
  • HOME
  • CEI
    • Wekiva 7A/B
    • I-4 Resurfacing
    • SR 44
    • I-95
    • US 441
    • Maintenance Work
    • A1A
  • TRANSPORTATION
    • Apopka Trail Network
    • Beresford Ave Extension
    • St. Johns River
    • Ocoee Apopka Road
    • Coastal Woods
    • Harmon Road Extension
    • SR-44 Resurfacing
    • Granada Pointe
    • Yorktowne Boulevard
  • THE TEAM
  • OFFICES
  • CAREER
  • SOCIAL
  • NEWS
  • SERVICES
  • PROJECTS

Ocoee Apopka Road Widening

Apopka, FL

Client: JAG Florida Development Company, LLC

Project Cost:  $9 million

Project Start: December 2021

Project Completion: March 2023


Key NEI Staff: 

·  Tyler J. Malmborg, PE | Project Manager and EOR

·  Michael Munier, EI | Lead Designer

·  Brad D. Bauknecht, PE | QA/QC

 

Scope of Services:

·  Designed reconstruction plans for widening an area of Ocoee Apopka Road from Keene Road to Alston Bay Blvd, approximately 3/8-mile in length, providing a re-aligned 4-lane divided roadway with a 12-ft multi-use trail along the western roadway boundary and 5-ft sidewalk along the eastern right-of-way line.

·  Drainage design including exfiltration system and pond siting for a dry retention area and passive park.

·  Design of Mast Arm for signalization.

·  Drainage design and coordination of SJRWMD stormwater and environmental permitting.

·  Coordination with City of Apopka, Orange County, and Workman Group for permitting and adjacent development coordination.