Client: JAG Florida Development Company, LLC
Project Cost: $9 million
Project Start: December 2021
Project Completion: March 2023
Key NEI Staff:
· Tyler J. Malmborg, PE | Project Manager and EOR
· Michael Munier, EI | Lead Designer
· Brad D. Bauknecht, PE | QA/QC
Scope of Services:
· Designed reconstruction plans for widening an area of Ocoee Apopka Road from Keene Road to Alston Bay Blvd, approximately 3/8-mile in length, providing a re-aligned 4-lane divided roadway with a 12-ft multi-use trail along the western roadway boundary and 5-ft sidewalk along the eastern right-of-way line.
· Drainage design including exfiltration system and pond siting for a dry retention area and passive park.
· Design of Mast Arm for signalization.
· Drainage design and coordination of SJRWMD stormwater and environmental permitting.
· Coordination with City of Apopka, Orange County, and Workman Group for permitting and adjacent development coordination.