• HOME
  • CEI
    • Wekiva 7A/B
    • I-4 Resurfacing
    • SR 44
    • I-95
    • US 441
    • Maintenance Work
    • A1A
  • TRANSPORTATION
    • Apopka Trail Network
    • Beresford Ave Extension
    • St. Johns River
    • Ocoee Apopka Road
    • Coastal Woods
    • Harmon Road Extension
    • SR-44 Resurfacing
    • Granada Pointe
    • Yorktowne Boulevard
  • THE TEAM
  • OFFICES
  • CAREER
  • SOCIAL
  • NEWS
  • SERVICES
  • PROJECTS
  • More
    • HOME
    • CEI
      • Wekiva 7A/B
      • I-4 Resurfacing
      • SR 44
      • I-95
      • US 441
      • Maintenance Work
      • A1A
    • TRANSPORTATION
      • Apopka Trail Network
      • Beresford Ave Extension
      • St. Johns River
      • Ocoee Apopka Road
      • Coastal Woods
      • Harmon Road Extension
      • SR-44 Resurfacing
      • Granada Pointe
      • Yorktowne Boulevard
    • THE TEAM
    • OFFICES
    • CAREER
    • SOCIAL
    • NEWS
    • SERVICES
    • PROJECTS
  • HOME
  • CEI
    • Wekiva 7A/B
    • I-4 Resurfacing
    • SR 44
    • I-95
    • US 441
    • Maintenance Work
    • A1A
  • TRANSPORTATION
    • Apopka Trail Network
    • Beresford Ave Extension
    • St. Johns River
    • Ocoee Apopka Road
    • Coastal Woods
    • Harmon Road Extension
    • SR-44 Resurfacing
    • Granada Pointe
    • Yorktowne Boulevard
  • THE TEAM
  • OFFICES
  • CAREER
  • SOCIAL
  • NEWS
  • SERVICES
  • PROJECTS

SR-44 Resurfacing, Restoration, and Rehabilitation (RRR) fro

Lake County, FL

Client: FDOT D5 

Project Cost:  $8 million

Project Start: January 2019

Project Completion: October 2022


Key NEI Staff: 

·  Tyler J. Malmborg, PE | Project Manager and EOR

·  Michael Munier, EI | Lead Designer

·  Brad D. Bauknecht, PE | QA/QC 


Scope of Services:

·  Analyzed the existing facility operations and crash data for 4.5 miles of SR44. 

·  Developed safety improvement and service life extension strategies.

·  The project design includes approximately 2-miles of cross slope correction, the addition of bicycle keyholes at existing right turn lanes, and an extension of the eastbound left turn lane at CR-439.

·  Rehabilitate areas of the roadway that experienced differential settlement post construction and no longer provided adequate cross slope for safe wet-weather operations. 

·  Investigated sinkhole activity & developed a remediation plan.